1-888-434-2359

5400 Lauby Road NW, North Canton, OH 44720  map this

let the fun begin
Obey the Bon

You will need Flash 8 or better to view this content.

What makes CAK a better way to go?

Watch more CAK Videos on YouTube

Go get'em, Tiger!

Free WiFi, free printing, a quiet place to free your mind and focus. Take advantage of our free Ohio Desk Business Center to hone that presentation and get the deal done!

Go get'em, Tiger!
13 non-stop destinations.

Get your vitamin D

Sun, glorious sun! Good for your health, good for your spirits, and a good deal of the bright stuff is found throughout our open, airy, cheerful concourse!

Get your vitamin D
go

Who needs peanuts? You have Amish Granola!

At the CAK Marketplace, you'll find all sorts of unique, locally
produced food and merchandise to bring along on your trip.

Go

Now boarding for Nirvana
go

Zippity-doo-da!

That's what you'll do through check-in and security, thanks to our shorter lines. (We get you
from car to gate 40% faster, in fact). My, oh, my, what a wonderful day!

Go

About
CAK 2018

CAK 2018 is our 10-year, $110 Million Capital Improvement Plan - the most ambitious capital improvement plan in our history.

The airport authority has unveiled CAK 2018 – the most ambitious capital improvement plan in Akron-Canton Airport's history. The 10-year, $110 million plan calls for 10 vital projects in the next 10 years. From a major runway extension to a new customs and border patrol facility to accommodate international flights, the projects will create new flight options for travelers in northeastern Ohio, the Cleveland+ region.

machinery in field

Watch the tour of our renovated food court and expanded TSA security checkpoint. This project is expected to be complete by Thanksgiving 2011.


See all of the projects of CAK 2018.

10 Projects of CAK 2018

Akron-Canton Airport's 10 Year Capital Improvement Plan

1 Runway 5/23 Extension - Completed in November 2010

Runway 5/23 will be extended from 7,600 ft. to 8,200 ft. This means CAK passengers will be able to fly farther – non-stop to anywhere in the U.S. and throughout Mexico and Canada. The safety area at the north end of the runway will be upgraded and our Instrument Landing System will be relocated. Cost: $60 million

2 Expand Aircraft Parking and General Aviation Area- Future

This will give us enough space to park 2-3 more Boeing 737-800 aircraft and could serve as a future deicing pad. A new ramp also will be built for private pilots. Cost: $5 million

3 Replace Aircraft Rescue and Fire Fighting Maintenance Facility (ARFF) - Active

A new 30,000 sq. ft. building will be built on a new site replacing our 30-year-old facility. It also will be an airfield management and weather center and house two fire trucks and other heavy equipment like snow plows and mowers. Cost: $5 million

4 New Customs and Border Patrol Facility - Active

The customs and border patrol facility is currently slated to replace our fire fighting facility (ARFF) because it is so close to customer parking lots. It will act as its own terminal for international arriving flights. It will house a customs check point and baggage claim area. International flights will depart from our main terminal building. Cost: $3.65 million

5 Expand Auto Parking Lots - Active

Up to 1,000 new spots will give the parking lot increased capacity by 50%. Cost: $2.5 million

6 Widen Entrance Road - Future

One more lane will be added to make dropping off or picking up passengers even easier. Storm water and sewer lines will be replaced beneath the road. Cost: $5 million

7 Expand Ticket Wing - Future

A new counter with three tickets position will be added as well an extra 150 ft. of check-in space. The expansion will also add more space for baggage make-up and TSA baggage checks. Cost: $2.5 million

8 Expand TSA Screening Area - Active

We will add 25 percent more space or up to 5,000 additional sq. ft. so we can accommodate an additional screening lane. That means that 33 percent more people could be screened per hour. The food court will be relocated to the other side of the main concourse to allow for the extra room. Cost: $3 million

9 Expand New Concourse - Future

Our new upper level concourse completed in 2006 will be extended by 300 ft. That provides for three more gates, a new business club, 300 more seats, a glass atrium and more restrooms. Cost: $18 million

10 Build new Port Green Industrial Park - Active

Partnering with the City of Green, we will apply for a grant from the State of Ohio's Job Ready Site Program to develop Port Green, a continuation of the already successful CAK International Business Park. The 213 acres will be developed into 10-12 business sites bringing up to 1,000 high paying jobs to northeast Ohio. Other potential regional economic impacts include $45 million in real property tax, $20 million in personal property tax and a $30 million annual payroll. Cost: $6 million

see more surveys

Tell us what you think

What's your favorite seat?

  • Vote
  • Window
  • Aisle
  • In exit row
  • In first row

Parking Capacity

Your spot is waiting!

Short Term: 40% Full
Long Term A: 50% Full
Long Term B: 40% Full
Economy: 50% Full

Last Updated December 19, 2014 @ 9:56am

http://www.southwest.com

Don't forget to Check Southwest.com too!

To be sure you are getting the lowest fare

Low fares and 2 bags fly free aboard Southwest! Nonstop to Orlando, Tampa, Ft. Myers, Boston, NYC, Atlanta, Denver and Washington D.C. Find deals online ONLY at Southwest.com. Sign up for Click n Save®- the best deals delivered to your inbox every week!

more

http://www.southwest.com

Atlanta. Nonstop. Now that's a peach.

Go to Southwest.com or Delta.com

Two great airlines; one peachy city. Go to Atlanta and beyond nonstop from CAK.

more

We love our customers! And they love us right back.

Join us on Facebook

Get the latest news and deals!

Sign up for our newsletter

Go
Site design and development by FORM